HOSPITAL KUALA KRAI FASA 2
This Hospital Kuala Krai Phase 2, is an extension block located uphill from the initial Hospital Kuala Krai in the State of Kelantan. The Electrical System is designed to run on Fully Essential Electrical Supply. This will avoid electricity failure in the Hospital Building due to flash floods occurrence.
PROJECT
CADANGAN MEMBINA HOSPITAL (268 KATIL) KUALA KRAI, KELANTAN (REKA & BINA) FASA 2: KERJA BANGUNAN DAN LAIN-LAIN KERJA BERKAITAN
COMPLETION YEAR
On-Going
SCOPE OF WORKS
Supply and Installation of 11kv High Tension (HT) and Low Voltage (LV) Electrical Works.
Back to top
RAPID PENGERANG
Johor Darul Takzim
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR RAPID TEMPORARY EXECUTIVE VILLAGE (RTEV) AND RAPID TEMPORARY MANAGEMENT OFFICE (RTMO) FACILITIES (PACKAGE 20-A3) FOR REFINERY AND PETROCHEMICAL INTEGRATED DEVELOPMENT (RAPID) IN PENGERANG, JOHOR DARUL TAKZIM
COMPLETION YEAR
On-Going
SCOPE OF WORKS
Supply and Installation of Low Voltage (LV) Electrical Works.
Back to top
PR1MA HOME
KG PALOH, IPOH
PROJECT
CADANGAN UNTUK MENDIRIKAN 2 BLOK PANGSAPURI JENIS SERVIS APARTMENT 31 TINGKAT (456 UNIT) DI ATAS LOT 14588 KAMPUNG PALOH, DAERAH IPOH, PERAK DARUL RIDZUAN UNTUK TETUAN SERI PERWIRA LOGISTICS SDN. BHD.
COMPLETION YEAR
On-Going
SCOPE OF WORKS
Supply and Installation of Low Voltage (LV) Electrical Works.
Back to top
PENJARA REMAN
TEGAR JOHOR
The Prison in the state capital of Johor in Malaysia, was constructed to incarcerate criminals in the State. The Prison is operated under the Kementerian Dalam Negeri (KDN). The design and construction of the Prison is overseen and under the jurisdiction of the Jabatan Kerja Raya (JKR).
PROJECT
Penjara Reman (Tegar) Johor Bahru, Johor – Fasa 2 (Reka & Bina)
COMPLETION YEAR
2016
SCOPE OF WORKS
Supply, Install, Testing and Commissioning of Electrical LV Works, Prison Lighting, Prison Public Address System and ELV system.
Back to top
IBU PEJABAT LEMBAGA PELABUHAN JOHOR
This Office Building is the Headquarter for the Lembaga Pelabuhan Johor. It is compliance to the Green Building Index (GBI Standard).
PROJECT
Pembinaan Bangunan Ibu Pejabat Lembaga Pelabuhan Johor, Pasir Gudang, Johor.
COMPLETION YEAR
2013
SCOPE OF WORKS
Supply, Install, Testing and Commissioning of Electrical (HT & LV) works, Motion/Presence Lighting, Compound Lighting etc..
Back to top
SURUHANJAYA PILIHAN RAYA (SPR) PUTRAJAYA
This SPR Building will be Headquarter of the National Election Commission in the near future. It is located at Putrajaya Lot2C10, behind the Ministry of Finance Complex. This SPR Building’s Lighting Design concept has 2 modes ie. Weekday and Weekend modes. The Weekday mode is of (White LED Luminance Effect) and the Weekend is of (RGB Colour Changing LED Luminance Effect).
PROJECT
The Proposed Construction and Completion Of The Remaining and Rectification Works of Government Office Building and External Works for Suruhanjaya Pilihanraya (SPR) On Lot2C10, Precinct 2, Pusat Pentadbiran Kerajaan, Wilayah Persekutuan Putrajaya.
COMPLETION YEAR
2014
SCOPE OF WORKS
Architectural Façade Lighting Works which includes Supply, Install, Testing and Commissioning of LED Fixtures, DMX Control System, Signal Cables etc works.
Back to top
Hospital Universiti Sains Malaysia HUSM
Hospital Universiti Sains Malaysia (HUSM) is a teaching hospital branch by USM Penang and was awarded to us under a direct contract by the Public Works Department of Malaysia (JKR). Mega Jati Consult JV Jurutera Perunding In-Tech were the appointed mechanical and electrical consulting engineers.
PROJECT
Pemasangan elektrik untuk Universiti Sains Malaysia (USM) - Bangunan/Peralatan HUSM: Sistem Voltan Tinggi & Infra (Pakej 4)
COMPLETION YEAR
September 2010 – December 2011
SCOPE OF WORKS
To build a Main Sub-Station which includes Piling, Building and Infrastructure works.
Supply, Install, Testing and Commissioning of High Tension (HT) Electrical System which includes HT Cast Resin Transformers, HT incoming Panel c/w Outgoing Feeder, HT Switchgears and HT Cablings..
Back to top
Mahkamah Jalan Duta
This project awarded to us by the Public Works Department of Malaysia (JKR). The mechanical and electrical consultant was JKR, Kuala Lumpur. This project was considered a special project and required thorough attention as the court will be accessed by vip’s, and heavily trafficked with public and media personnel.
PROJECT
The supply and installation of Extra Low Voltage System For The Mahkamah Baru Kuala Lumpur Jalan Duta, Wilayah Persekutuan Kuala Lumpur.
COMPLETION YEAR
August 2006 to February 2007
SCOPE OF WORKS
Supply, Installation, Testing and Commissioning of Public Address System, Conference System, CCTV System, Projectors and Motorised Screens, Sound Reinforcements System and Sound Acoustic System.
Back to top
Kementerian Kesihatan Malaysia
This project awarded to us by the Ministry of Health. The mechanical and electrical consultant was JKR, Putrajaya.
PROJECT
Pemasangan Sistem “Audio Visual” Untuk Bilik-Bilik Mesyuarat Kementerian Kesihatan Di Parcel E, Pusat Pentadbiran Kerajaan Persekutuan,Putrajaya.
COMPLETION YEAR
February 2004 – April 2005
SCOPE OF WORKS
Supply, Installation, Testing and Commissioning of Public Address System, Conference System, CCTV System, Projectors and Motorized Screens, Sound Reinforcements System and Sound Acoustic System.
Back to top
TIJANI UKAY
PROJECT
Pembangunan 118 Unit Perumahan Di Bawah Seksyen 16(1A), Akta 318 (Gated Community) Yang Mengandungi:-
1) Jenis A – Rumah Sesebuah Zero Lot 2 ½ Tingkat (75 Unit)
2) Jenis B – Rumah Sesebuah Zero Lot 2 ½ Tingkat (35 Unit)
3) Jenis c – Rumah Sesebuah Zero 3 Tingkat (8 Unit)
Berserta 1 Unit Rumah Kelab 2 Tingkat Dan 1 Unit Pondok Pengawal 1 Tingkat, Di atas Lot15283, Seksyen 2 Bandar Hulu Kelang, Daerah Gombak, Selangor Darul Ehsan Untuk Tetuan Ketapang Realty Sdn bhd (Tijani Ukay)
COMPLETION YEAR
2015
SCOPE OF WORKS
Supply, Install, Testing and Commissioning of Infrastructure works for Electrical (HT & LV), Tele-Communication, Street Lighting, CCTV Surveillance system and Semi-Smart Home Video Intercom System.
Back to top
KULIM HI-TECH PARK
The Kulim Hi-Tech Park (KHTP) , officially opened in 1996, is the first Hi-Tech Park in Malaysia. The KHTP is situated in the district of Kulim, in the state of Kedah, in the north-west of Peninsular Malaysia. Currently, the development of KHTP covers an area of approximately 1,700 hectares (approximately 4,000 acres).
PROJECT
Proposed Construction and Completion of Earthworks, Roadworks, Detention Pond, Drains, Sewers, Sewages Treatment Plant, Water Mains, Elevated Reservoir, Street Lighting, Telecom Ducting and Manholes and Ancillary Works For Industrial Zone Phase 4, Kulim Hi-Tech Park.
COMPLETION YEAR
2015
SCOPE OF WORKS
Supply, Install, Testing and Commissioning of Infrastructure works for Electrical (HT & LV), Tele-Communication, Street Lighting and Perimeter CCTV Surveillance system.